ZGS American type prefabricated substation is suitable for 10KV ring network power supply, dual power supply or terminal power supply systems, as a transformer, metering, compensation control and protection device.
GB/T17467-1998 "High voltage and low voltage prefabricated substations"
DL/T137-93 Technical Conditions for Ordering 6-35KV Box Substation
◆ Altitude not exceeding 1000 meters
◆ Environmental temperature: -35 ℃~+40 ℃:
◆ Relative temperature:, daily average value not exceeding 90%, May average value not exceeding 90%:
◆ Installation location: No fire, explosion hazard, chemical corrosive gas, and well ventilated place, ground inclination angle not exceeding 3 °.
◆ Fully insulated, fully sealed, maintenance free, and reliable to ensure personal safety;
◆ Compact structure, with a volume of only 1/3 to 1/5 of the same capacity of European transformers, and low height;
◆ A split box structure can be adopted to avoid oil contamination in the transformer oil tank;
◆ The high-voltage side adopts dual fuse weight range protection, greatly reducing costs;
◆ It can be used for ring networks or terminals, and the cable head can be urgently plugged and unplugged when the load current is 200A; The box adopts a honeycomb double layered composite board, which has the function of temperature insulation and heat dissipation
◆ Install an electronic phase loss protector on the low-voltage side, which can quickly disconnect the main incoming switch when abnormal voltage occurs in the system; High voltage oil immersed load switch or SF6 load switch can be upgraded electrically, laying the foundation for achieving distribution network automation; Use oil immersed S9 or better performing S11 series transformers.
Technical requirements:
◆ For dimensions, please refer to the actual dimensions of the combination variable;
◆ The concrete foundation machine should have a flat surface, and the combined substation should be fixed on the foundation using pressure plates;
◆ The types of grounding bars and cable fixing brackets can be determined according to the actual situation;
◆ Cable fixing brackets and grounding bars should be pre embedded;
◆ The position of cable holes for incoming and outgoing lines depends on the specific situation;
◆ After the installation of the combination transformer, there must be a gap of no less than 1.5m on the front of the switch for easy operation;
◆ The grounding grid can be made of 12 galvanized round steel or 40 × 4 galvanized flat copper, and the grounding resistance should meet the requirements of the power department.